Power Projects

Power Projects

Power House

Type - Surface
Installed Capacity - 2 X 7.5 MW
Turbine - Horizontal Francis
Generator - Horizontal Shaft alternating Synchronous type
Design discharge - 11.9 Cumecs
Rated Net Head - 147 M
Size of Power House - 50 M X 22.5 M X 12 M
Switchyard Size - 30 M X 20 M

Diversion Structure

Intake Structure - Trench Weir
Design Discharge (including flushing) - 14.88 cumecs
Length of Trench Weir - 30.00 Mtrs.
Width of Trench Weir - 2.50 Mtrs.
Depth of Trench Weir Starting Point - 1.50 Mtrs
Depth at Intake Point - 3.50 Mtrs.

 

Desilting Basin

Number of Desilting Chambers - 2 Nos. Hopper Shaped
Length of Desilting Chambers - 93.00 Mtrs.
Size of Desilting Chambers - 6.2 M (W) X 4.5 M (D)
Particle size to be excluded - Above 0.2 mm
Flow velocity through chamber - 0.2 M/Sec.
Design Discharge including Flushing - 14.88 Cumes

 

Penstock

Length of main Penstock - 240.00 M
Dia of Main Penstock - 2.24 M
Discharhe of Main Penstock - 11.9 Cumecs
Thickness of Main Penstock - varying 10mm to 20mm
Dia of unit Penstock - 1.50 M
No. of Unit Penstock - 2
Length of unit Penstock - 24 M
Plate thickness of main Penstock - 16mm
No. of Anchor Blocks - 7
No. of Saddles - 16

RCC Duct Water Conductor

Upstream Power Channel

Length - 1000 Mt
Section - 3M x 3M R.CC Rectangular covered section
Full Supply Depth - 2.35 Mt
Design Discharge - 11.9 Cumes
Slope - 1 in 1500
Design Velocity - 1.8 M/Sec

 

Tail Race Channel

Tail Race Channel - Trench Weir
Maximum Water Level - 1149.00 M
Minimum Water Level - 1147.00 M
Length of Tail Race Channel - 2 X 25.00 M

 

 

 

Forebay

Size - 50 (L) x 14 (W) x 5 M (D)
Stroage Capacity - 2005 Cumes
Retention Capacity - 3 Minutes
F.S.L - 1298.50 M
M.D.D.L - 1296.00 M

Feeder Channel

Length - 137.5 Mt
Size - Rectangular 3M x 3M

 


Inlet - Tunnel

 

 

 

Exit - Tunnel
Machine Hall
Control Room
Switch Yard